Solar guidance · Huntington Solar Co
Long Island solar, explained.
Pricing math, permit walkthroughs, incentive deep-dives — written by the people who do the installs, for the homeowners who pay for them.
-
Tesla Powerwall 3 vs Enphase IQ Battery 5P: which is better for Long Island in 2026?
Tesla Powerwall 3 wins on raw capacity (13.5 kWh) and price-per-kWh; Enphase IQ Battery 5P wins on modularity and microinverter compatibility. The right pick depends on your existing solar hardware and how much of the home you want to back up.
Read article → -
How much does solar cost in Huntington, NY in 2026?
Residential solar in Huntington runs $24K–$28K gross for a typical 8 kW system in 2026. Federal + NY State incentives drop that to $12K–$15K net out-of-pocket, with 5–7 year payback at current LIPA rates. Here is the line-by-line math.
Read article → -
Solar permits in the Town of Huntington: a 2026 walkthrough
Town of Huntington solar permits in 2026 typically clear in 3–5 weeks: 1–2 weeks for Building Department review, 1 week for the electrical permit, and 1–2 weeks for PSEG interconnection approval. Here is what happens at each step.
Read article →